Design

Delivering heat pump integration at Canalside, Woking

Heat pump integration at Canalside, Woking
Project background
Exi-tite designed and supplied a renewable and robust heating solution for a mixed-use housing project in Woking, Surrey. Kane Group delivered the overall M&E package for the Canalside Purple Phase regeneration on behalf of main contractor Gilbert-Ash. The 14-month contract involved full M&E fit out of 82 flats and 10 three-storey townhouses in the medium-rise development, including a low-carbon, reliable and future-proof heating and hot water system.
System design
The system comprises 10×LG Therma V R32 Monobloc 9kW air-to-water heat pumps for the townhouses, each paired with a 250-litre World Heat pre-plumbed cylinder with integral buffer vessel.
LG’s compact, side-discharge units eliminate the need for refrigerant pipework and therefore simplify installation. Operating range spans -25°C to +35°C ambient, with water leaving temperatures up to 65°C. Performance is maintained at 100% output even at -7°C ambient and 55°C LWT, and the units deliver a COP of up to 4.18 at 7°C ambient/35°C LWT.
Key design features include:
• Inverter-driven R1 compressor (10-150Hz)
• Black Fin epoxy-coated heat exchanger coils for corrosion resistance
• Integrated hydronic module (pump, expansion vessel, plate heat exchanger)
• Low noise operation (50 dB(A) at 1metre).
This configuration provides efficient, decentralised heating across the installation, with individual plant for each residence.
The World Heat V-Cyl pre-plumbed heat pump cylinders are manufactured in the UK from duplex stainless steel and supplied with a 25-year vessel warranty.
Integrated components include:
• 50-litre buffer vessel
• Grundfos UPM3 circulation pump
• Honeywell 2-port and 3-port valves
• LG RS3 controller interface
In terms of performance, the cylinders offer 35-45-minute reheat times, 90-watt standing heat loss and ERP “B” rated insulation. The pre-plumbed design reduced installation time and coordination risks, ensuring consistency across all 10 apartments.
Carport challenge
Due to site constraints, the outdoor units were positioned within car ports. These semi-enclosed environments presented potential risks of restricted airflow and hot air recirculation, both of which could impair efficiency and long-term reliability.
To validate the installation, LG Electronics performed Computational Fluid Dynamics (CFD) modelling in ANSYS R19.2. Under boundary conditions of 35°C ambient and 100% load, results showed a maximum inlet air temperature of 38.5°C, well below the continuous operation threshold of 48°C. Discharge air left the car ports cleanly without recirculation into unit inlets. The conclusion was that the units would operate within safe thermal limits, confirming suitability of the constrained location.
Outcome
The completed installation of LG Therma V Monobloc ASHPs paired with World Heat pre-plumbed cylinders has delivered a robust, validated, low-carbon heating solution at the Canalside development.
Key benefits of the system include:
• Assured performance validated through CFD analysis for semi-enclosed car port installation
• Reduced installation time through factory-prepared, pre-plumbed hot water cylinders,
• A future-proof heating system combining renewable efficiency, corrosion-resistant construction and long warranties
This project also underlines how close collaboration between Ex-tite, Kane Group, LG Electronics and World Heat enabled the successful delivery of a sustainable and technically assured renewable heating solution.

Read More »
AHU

Exi-tite healthcare excellence supports hospital AHU upgrades

Our unrivalled expertise in healthcare projects paved the way for major air handling unit (AHU) refurbishments at two hospitals in Northern Ireland. Both projects involved upgrades using high-quality Wolf parts to ensure the equipment meets Health Technical Memorandum (HTM) 03-01 specification, which covers specialised ventilation systems for healthcare premises.

Read More »
Meeting HTM requirements through integrated air handling and energy recovery
Delivering heat pump integration at Canalside, Woking
Zehnder ventilation and air treatment systems for Hurlingham Waterfront
Interested in CPD?

We deliver CPDs across the UK and Ireland to consultants, architects and M&E specialists.

Our presentations cover industry trends, technological innovations, and applications across a range of HVAC sectors.

We'd Love To Hear From You

contact us

Ballygawley

Find us Here

15a Grange Road
Ballygawley
Dungannon
BT70 2LP

Get In touch

+44 (0) 28 855 67674

Office Hours

Mon-Thurs: 9am- 4pm
Fri: 8am-1pm

Take the first step, we
will take care of the rest