Targeting a BER A3 and LEED Gold, Rothco house is floors of grade A development. Restrictions for the positioning of air conditioning condensers meant that CFD analysis had to take place to develop a workable solution that allowed sufficient airflow around the system. Changes to the design of the exhaust air ductwork allowed for successful commissioning and operation of the latest in VRF technology – LG Multi V 5.
Equipment
Outdoor units
6 x Multi V 5 VRF
Indoor units
69 x Multi V Ceiling Concealed Ducted Units – Low Static
Controls
69 x Premier touch screen room controllers
1 x AC Smart touch screen centralised controller
Designed to NR25 with automatic independent electricity billing using CFD analysis. Thermal comfort was maximised by LG’s Dual sensing control and ‘Comfort Cooling’ technology.
Installation space was extremely tight on this project, the location of the outdoor units took a lot of consideration
Building modelling simulation to remove discharge air
ISO view of proposed condenser locationISO view of case 1 and 2ISO view of case 3CASE 2: Condenser supply air temperature reaches 49oC because of short cycling -which is outside of the systems operating range.CASE 1: Installing an air guide to prevent recirculation reduces supply air temperature to 48.5CCASE 3: Redesigning the ducted section to include a vertical louvred section reduced supply air temperature to 42C