Skip to content

Located at the heartland of Dublin’s vibrant City Centre, only a 5-minute walk from St Stephen’s Green. The new wedge-shaped Marlin hotel has 301 bedrooms over 7 storeys with 2 basement levels. Exi-tite supplied an array of ventilation solutions including specialist high temperature and smoke extract. Building efficiencies were maximised using run around coils between separate supply and extract AHU’s for energy recovery. 

Equipment

Ventilation 

6 x Supply Air with LG DX 

6 x Extract Air with heat recovery run around coils 

2 x Helios Itech twin fan – plant room extract and supply 

3 x Helios Smoke Extract Fan – Plant room and Basement 

1 x Helios T120 – high temperature kitchen extract 

1 x Helios Silent Box – Bin store extract 

3 x LG Energy Recovery Ventilation – Meeting rooms 

Reducing power consumption whilst maintaining effective operation 

Get in touch

Interested in CPD?

We deliver CPDs across the UK and Ireland to consultants, architects and M&E specialists.

Our presentations cover industry trends, technological innovations, and applications across a range of HVAC sectors.

We'd Love To Hear From You

contact us

Ballygawley

Find us Here

15a Grange Road
Ballygawley
Dungannon
BT70 2LP

Get In touch

+44 (0) 28 855 67674
sales@exi-tite.com

Office Hours

Mon- Fri: 9am- 4pm

Take the first step, we
will take care of the rest